一级片免费观看-找av导航-美日韩毛片-免费看v片-樱桃视频app看片-狠狠操免费视频-国产一区免费在线观看-97成人超碰-日本黄色电影网-国产不卡a-校霸被c到爽夹震蛋上课高潮-免费在线观看一区二区-色吧视频-里番acg本子h无尽-各处沟厕大尺度偷拍女厕嘘嘘-色老头免费视频-四虎黄色影视-国产精品99久久-不卡的一区二区-国产三级av在线播放-少妇bbbb搡bbbb桶-美女被艹哭-午夜激情视频网-日本xx视频免费观看-亚洲午夜精品一区二区三区他趣-国产亚洲高清视频-亚洲肥妇-成人精品免费看-午夜日b视频-丁香五月欧美成人

Email: info@ldsyty.com Tel: +86-13141371828

Company news


Badminton Hall Project in Dongbao District, Jingmen City (Main Hall 5,700.57㎡, Sub Hall 1150.71㎡)

  Project Introduction
The project is the largest badminton training base in Hubei Province, with a total construction area of 19,410.81 square meters. It is designed with three floors, of which the first floor is for supporting commercial service rooms and indoor parking lots, the second and third floors are badminton halls, and the total building height is 31.3. Meter.
The hall has a main and auxiliary double hall with a total of 34 venues, and the auxiliary hall contains 2 standard badminton pads; the main hall has 32 standard badminton pads, of which 16 standard badminton pads in the training hall on the second floor will be open to the public in the future.
The project is mainly built by China First Metallurgical Group, and Zero Times is responsible for the design and construction of sports wooden flooring. In terms of design, the lighting design, sports floor design, architectural acoustics, and air height design of the badminton hall all meet the requirements of international competitions.

(也做封面圖)
  Product Introduction
Product Information: Zero Times Sports Wood Flooring (LDSD-Ⅲ), Imported Sports Wood Flooring
LDSD-Ⅲ: Meets FIBA certification standards, passed DIN testing standards, double-layered strong sleeper, perfect shock absorption function, can meet various indoor competitions, exhibitions, theatrical performances, etc.
Imported sports solid wood flooring: It has achieved FIBA and BWF certification, passed DIN testing standards, provides excellent elasticity, and has effective shock absorption function. The unified and strong structure makes the performance of the entire floor system more uniform and meets the requirements The user's requirements for the performance, appearance and durability of the floor meet the requirements of all training and international competitions.

  Project Installation
1. Waterproof and moisture-proof layer; shock-absorbing cushion; sleeper layer
Lap-laying method is adopted for the moisture-proof plastic sheet on the bottom layer. The fixed and firm spacing of rubber pads is 450mm. The site is designed as a double-layer sleeper structure with suspended paving. The lower sleeper is laid out along the long direction of the venue with a distance of 450mm. The upper sleeper is laid along the short direction of the venue, and the two sides are laid out parallel to the short side with a distance of 400mm; Reserve a 10--20mm wide expansion gap, and use rubber pads to cushion the sleeper joints.

2. Plywood layer
The plywood installation is parallel to the main sleeper, the longitudinal spacing is reserved 5mm, the Zerotal spacing is reserved 5mm, and the special N17 slab nails are evenly fixed, and the distance between the fixed nails is 250mm. The debris and garbage between the sleepers are cleaned up, and the end surface of the plywood is not allowed to hang in the air; the adjacent parallel load distribution layers are staggered with each other, and the staggered distance is ≥400mm.

3. Moisture-proof and Sound-proof Film Layer
The moisture-proof and sound-proof pad between the rough floor and the surface floor is made of environmentally friendly polyethylene moisture-proof material, and the joints are overlapped and connected by adhesive tape.

4. Panel layer
A unified split-layer paving method is adopted, which is pavement from one side of the wall to the other, and the long direction of the panel is perpendicular to the mat and sleeper, and the imported L-shaped floor special nails are used to fix the mat on the mat. The joints of two adjacent rows of motion panels should be staggered by more than 150mm.

5. As-built Drawing
As the largest and most professional standardized badminton stadium in Hubei Province, Jingmen Dongbao District Badminton Stadium officially opened on September 13, 2019, announced the trial operation, and will host the 2019 Hubei Province U9-10 and U16- for the first time. 18 badminton points match.

The hall is built in accordance with the standards of international first-level competitions and can be used for national team training and can host international competitions. In addition, the badminton auxiliary hall can also be transformed into a variety of venues such as basketball courts and large-scale exhibition venues.
 
 
主站蜘蛛池模板: 特级西西人体444www高清大胆 | 亚洲精品乱码久久久久 | av免费网站 | 午夜18视频在线观看 | 亚洲啪啪 | 手机在线看片 | 在线爱情大片免费观看大全 | 欧美精品在线观看 | 亚洲码无人客一区二区三区 | 潘金莲一级淫片aaaaaa播放 | 日韩精品 | 久久精品影视 | 黄色激情小说 | 山外人精品影院 | 樱花视频在线观看 | 男人天堂网站 | 日韩精品人妻中文字幕有码 | 亚洲午夜精品久久久久久app | 97精产国品一二三产区 | 国产精品一区二区在线观看 | 免费精品视频 | 天天躁日日躁狠狠很躁 | 麻豆传媒网站 | 日韩久久精品 | 久久不卡 | 免费看黄视频 | 日韩一区二区在线观看 | 欧美一区二区在线观看 | 日韩一二三区 | www黄色| 玖玖精品 | 成人国产精品久久久网站 | 国产真实乱人偷精品视频 | 四虎网站 | 久久久久久久久久久久久久 | 成人做爰69片免费观看 | 欧美高清 | 成年人在线视频 | 日韩成人精品 | 超碰91在线 | 姐妹 5| 波多野结衣一区二区三区 | 手机看片日韩 | 国产亚洲色婷婷久久99精品91 | 日本免费视频 | 国产欧美日韩在线 | 91日韩 | 华丽的外出在线 |